What problems arise when drilling wells?

What problems arise when drilling wells?

The presence of its own well in the summer cottage opens great opportunities. You can not only have a constant source of water, but also provide competent water supply to the garden area, not spend money on buying drinking water.

True, drilling wells in Ruza is a complex and technological procedure that requires a large number of factors.

Among the main difficulties of the drilling process, the following can be distinguished:

Swimming up. Silence is a special type of soils that contain a large amount of water. During their processing, the soil is destroyed and falls into the foster space of the future well. Working with swimming units requires extreme accuracy, otherwise the source will turn out to be dirty and poor.

Lack of geological data. Cooperation with professionals is attractive for several reasons. Experienced specialists have reliable information about the regional distribution of aquifer, about the composition of soil breeds. This allows not only drilling quickly and efficiently, but also makes it possible to choose the most profitable place to create a source.

Soldering of soil. If work is carried out on loose soil, drawing and collapse of soil is possible. This often happens after floods, when the soil is significantly weakening and becomes mobile. In this case, the structure of the well must be carefully strengthened.

What are professional companies offer?

Before proceeding to drill, experts conduct a comprehensive study. It is necessary to determine the geodetic characteristics of the site, select a place for the well, as well as prepare equipment and inventory. The companies have equipment at the disposal that can work in different conditions. Even in a compact summer cottage, the development of a source will not become a problem. Specialists are ready to drill even in the winter season.

The preparation of the tank can be carried out in conjunction with other types of work. The installation of Kison, the design of the landscape site, the construction of a canopy or a full -fledged structure are in wide demand. Before performing the procedures, employees of the organization will draw up a competent price list, which can be developed taking into account the customer budget.